We needed drawings quickly for our wall opening in Amsterdam. Tekenpunt handled this fantastically. The environmental permit went through first time.
Wall openingWall opening in Amsterdam
For this project in Amsterdam we prepared the construction drawing and supported the permit application for an internal wall opening. The client rated the collaboration 5 out of 5 stars.
Wall opening in Amsterdam
Just like our other internal wall opening projects, we prepare the permit-ready drawing in advance and check the Amsterdam municipality's aesthetics review requirements, so the plan has the best chance of passing in one go. An internal wall opening project with Tekenpunt starts from €599 incl. VAT, with a fixed price upfront and delivery planned by arrangement (rush available for a surcharge).
Key project details
- Type
- Wall opening
- Location
- Amsterdam, Noord-Holland
- Year
- 2019
- Drawing price from
- €599 incl. VAT
- Klantbeoordeling
- 5/5 sterren
Wat Tekenpunt standaard levert
- Existing and new situation drawings (floor plan, elevations, sections)
- Guidance with the environmental permit and the aesthetic review
- Fixed price upfront, no cost surprises
- One fixed point of contact, fully remote
What the client said
Wall opening in Amsterdam: frequently asked questions
Q01What does an internal wall opening cost in Amsterdam?
A permit-ready drawing for an internal wall opening starts from €599 incl. VAT at Tekenpunt. The exact price depends on the size and complexity; you get a fixed price upfront, with no surprise extras afterwards. Request a no-obligation quote.
Q02Do I need a permit for an internal wall opening in Amsterdam?
That depends on the type of work and the rules of the municipality of Amsterdam. We check the local aesthetic-review policy and the zoning plan in advance, so you know where you stand.
Q03How long does an internal wall opening take, from drawing to permit?
We deliver the construction drawing by arrangement (see your quote), with rush delivery faster for a surcharge. The permit procedure itself takes eight weeks for a regular application (Omgevingswet).
Got a similar project in mind?
Whether you live in Amsterdam or elsewhere in the Netherlands: we handle design, structural engineering and permit from A to Z. Since 2016, 930+ projects. Request a no-obligation quote.