How it works at Tekenpunt
From application to approved permit, in five clear steps. You see an indicative price right away, often get your quote the same day and then follow every step live in your own dossier. 90% of our designs pass aesthetic review in one go. We draw throughout the Netherlands.
From application to approved permit
Every step is concrete and you always know where you stand. No surprises, no loose ends.
Application with an instant indicative price
You submit your application online and immediately see an indicative price based on your type of renovation. This way you know the ballpark in advance, before committing to anything.
- An instant indicative price online
- Tailored to your type of renovation
- No obligations yet
- Questions? Phone, email or WhatsApp
Your quote, often the same day
On your application we prepare a personal quote, often the same working day. You approve it easily online with one click.
- Personal quote, often the same day
- Fixed price upfront
- Online approval with one click
- No paperwork
Follow everything in your own dossier
As soon as you agree, you get access to your personal dossier. There you follow the status of your drawing live, ask your questions, share your files and see exactly which phase you're in. You're never left in the dark.
- Your own online dossier
- The status of your drawing live
- Ask questions and share files
- Always insight into the phase
We make the drawings and arrange the permit
We take care of the drawings, the aesthetic review pre-check and, where needed, the permit application. 90% passes aesthetic review in one go.
- Floor plans, elevations and sections
- Aesthetic review pre-assessment
- Permit application where needed
- 90% passes aesthetic review in one go
Your package delivered complete
Your complete package is ready in your dossier: drawings, calculations and all the documents you need.
- Complete package in your dossier
- Drawings and calculations
- Delivered as PDF and DWG
- Ready to submit or to build
Four things that are always guaranteed
No small print. This is what you get on every project, regardless of size.
Fixed price upfront
You receive a fixed-price quote. You pay what we agreed, with no additional charges afterwards.
90% through aesthetic review first time
Thanks to our aesthetic review pre-screening, the vast majority of applications pass the review in one go.
Revisions within scope
Adjustments within the agreed assignment are included. What we agree on, we work out until it's right.
One dedicated point of contact
From intake to delivery you have the same point of contact. Short lines of communication and no unnecessary referrals.
How long does the whole process take?
We usually have the drawing itself ready within three to four weeks. Need it faster? That's possible with priority service for a surcharge. If a permit is required, the municipal decision period is added on top. These are target dates.
Standard turnaround for the drawing work, from application to delivery of the complete set.
In a hurry? Within 2 weeks is possible for a 30% surcharge, within 1 week for 50%.
If a building permit is required, the municipality's decision period of approximately 8 weeks applies, separate from our drawing work.
* Lead times are indicative and depend on the scope of the project and the speed of response to interim feedback. The municipality's decision period is independent of Tekenpunt.
Questions about the process
Q01Do I need to be present for the site survey?
That is possible but not always necessary. For a home visit with a 3D scan we come at a time that suits you. If you prefer to supply your own photos and measurements, we work with those. We will let you know exactly which information we need.
Q02What if the drawing is not approved straight away?
No problem. After the first version we incorporate your feedback in a revision round. Revisions within the agreed scope are included in the price. If the aesthetic review committee requests a change, we correct it free of charge until the drawing is approved.
Q03Do you also submit the building permit on my behalf?
Yes, if you want that we handle the complete building permit application with your municipality. We check the design against the aesthetic policy in advance, which means 90% passes the aesthetic review first time. The municipal decision period of approximately 8 weeks is separate from our work.
Q04Do you work across the Netherlands?
Yes. Our office is in Amsterdam, but we draw for projects across the Netherlands. We do the drawing work remotely and submit any permit to your municipality. For every municipality we know or check the aesthetic policy.
Take the first step
Send us your plans and you will receive a fixed-price quote the same day. Free advice on feasibility and permitting. No obligation.