Adding a storey across the Netherlands
A full extra storey on top of a flat roof. The largest floor-area gain of all roof types and maximum increase in residential value. A permit and structural check are always required. We handle everything from drawing to handover-ready.
Adding storeys is a full extra storey on top of a flat roof, over the whole footprint of the home or complex. A permit-ready drawing costs from €649 incl. VAT and we plan it by arrangement; rush is available for a surcharge. An environmental permit is always required. You follow your entire application live in your own online file, from quote to delivery.
Adding a storey means building a full additional floor on an existing flat roof, across the entire footprint of the home or complex. This is fundamentally different from a roof extension (extra space on a pitched roof) or a dormer (a projection in the pitched roof surface). Below are the elements that always require attention when adding a storey.
123456
1
Existing load-bearing structure and foundation
The first check: can the existing load-bearing walls, floor joists and foundation support the additional load? We establish this with a structural calculation. No permit application starts without its approval.
2
New structural floor
The floor of the new storey rests on the existing walls or on additional steel profiles. Thickness and reinforcement details are determined in consultation with the structural engineer.
3
Walls new storey
Light steel frame or masonry, depending on the load-bearing capacity. Insulation values must meet the current Building Decree requirements (Rc ≥ 4.7 for walls).
4
Facade connection and insulation
The junction between the new facade and the existing exterior wall is a cold bridge risk. We detail this carefully in the drawing.
5
New flat roof or pitched roof
The top closure of the additional storey, flat or with a shallow pitch. Including roof edge, drainage and roof insulation (Rc ≥ 6.3).
6
Staircase and entrance to new level
Access to the new floor requires space on the existing storey. We determine the position and width of the staircase early in the design process.
§02 Quick check
Permit and structural check
Adding a storey significantly alters height and silhouette. A building permit is always required. Four questions to estimate the complexity.
1
What type of roof does your property currently have?
2
What type of property is it?
3
Is a structural drawing or foundation report available?
4
How many storeys do you want to add?
✓ Feasible, permit always required
Adding a storey always requires a building permit with an aesthetic review. In addition, a structural calculation is necessary to confirm that the existing structure can handle the extra load. For a flat-roof terraced house with 1 extra storey, this is achievable in most cases. We assess your situation free of charge and draw up a fixed-price quote.
§03 Costs
Calculate your added storey price
Indicative calculator for design and permit. Construction is carried out separately by a contractor.
The build itself is then handled by a contractor (not by us):
Construction costs adding a storey (indicative)± €77,000
* We handle design, building permit and (if desired) structural calculation. Construction is carried out separately by a contractor; build costs are an indication based on approximately €2,200 per m² for adding a storey. Request a quote for exact drawing costs.
Amounts shown are incl. VAT (consumer price); the amount below the total is the amount without VAT. Your personal quote always shows the exact total price.Amounts shown are excl. VAT; the amount below the total is the amount incl. VAT (consumer price). Your personal quote always shows the exact total price.
§04 Packages
Choose your package
Every package includes the drawing. Add structural calculation or the full permit route.
Drawing
from€649 incl. VAT
Existing + new floor plans, elevations, relevant sections and site plan to scale
PDF + DWG files, suitable for the municipality and your contractor
Our own structural engineers and drafters work per Eurocode and check against the Bbl building code; every drawing and calculation is reviewed internally by our checkers before release.
930 projects since 2016, and 90% clears the aesthetics review (welstand) on the first pass — meaning: no design change needed after the municipality's first assessment.
4.9 out of 13 reviews for this type of renovation (19 projects since 2016).
§05 Three variants
Which storey addition suits your building?
From a single extra storey on a terraced house to multiple storeys added to an apartment block. We advise on what is structurally and planning-wise feasible.
1 extra storey on a terraced house
The most requested type of adding a storey: a full extra floor on top of a flat-roof terraced house. +30 to +50 m², always including building permit and structural calculation.
PermitAlways required
Extra space30-50 m²
Lead timeOn quote
Priceon quote
Adding a storey to an apartment building (2 floors)
Two extra storeys on a flat or gallery-access building. Owners' association approval required, more extensive foundation investigation. Significant area gain for the entire complex.
PermitAlways required
HOA approvalRequired
Permit process16+ wks
Priceon quote
Adding a storey with footprint extension
A combination of adding a storey and a larger footprint on the new level, or merging neighbouring roofs. Maximum floor-area gain, the most complex process.
PermitAlways required
Extra space50-80+ m²
Permit process16+ wks
Priceon quote
§06 Comparison
Adding a storey vs alternatives
Adding a storey yields the most m² but places the highest demands on structure and foundations. Here is the full comparison against the alternatives.
Adding a storey
Design from €649 incl. VAT
Building permit always required
Structural check required
30-80+ m² extra living storey
Most demanding structural requirement
Roof extension
Design from €649 incl. VAT
Building permit always required
On sloped roof, lighter construction
20-50 m² full additional floor
Increases the property value
Ridge raising
Design from €649 incl. VAT
Building permit required
10-20 m² extra living space
Lead time by arrangement
Retains roof shape
Dormer
Design from €379 incl. VAT
Rear often permit-free
2-9 m² extra main space
No additional storey
Lightest intervention
§07 Situations per property
What do you need for your property?
The complexity of adding a storey depends greatly on the type of building, the construction period and the local aesthetic review requirements. A few typical scenarios.
Site plan
Structure
Permit
Price
Complexity
Post-war flat-roof terraced house
Calculation recommended
Required
On quote
Standard
Pre-war terraced house (brick foundation)
Foundation survey
Required
On quote
Medium-weight
Apartment complex (Owners' Association)
Structural investigation
12+ wks
On quote
Heavy
Protected townscape
Structural calculation required
Required
On quote
Strict aesthetic review
Adding a storey + expanding the footprint
Full investigation
14+ wks
On quote
Very complex
§08 Case study
Example project: adding a storey to a terraced house
CASE · ROTTERDAM · 04.2026
Extra storey on flat-roof terraced house
Example project · adding a storey 1 floor · post-war home · +45 m²
+45 m² space
Standard permit
€649 incl. VAT our design
Fast drawing
FOR
SKETCH
STRUCTURE
NA
Challenge: A family in Rotterdam had a post-war flat-roof terraced house (built 1962) and wanted to expand without moving. The property already had a rear extension. Adding a storey was the only option to create a full additional bedroom floor.
Our approach: We started with a structural pre-scan: wall thickness, floor span and an estimate of the foundation. The outcome was positive. We then produced the architectural drawings for the building permit, including the facade connection, roof waterproofing and insulation details. The structural engineer worked out the calculation in parallel.
Result: 45 m² of extra living space on the new floor, existing layout below left untouched. Permit granted in 8 weeks, construction completed in 10 weeks. Property value estimated to have risen by approximately 15%.
§09 Additional info
Financing, HOA and sustainability
Adding a storey is a significant investment with a high return. What you still need to know about financing, homeowners association approval and sustainability requirements.
Building permit always required
Adding a storey significantly alters the height and street profile of a building. A building permit with aesthetic review is always required. We handle the application in full, including drawings and supporting documentation.
SOURCE · ENVIRONMENT ACT 2026 / Bbl
Renovation mortgage or own funds
Adding a storey increases the property value significantly and can be co-financed through a renovation mortgage (NHG up to 106% of the value after renovation) or a building deposit at your bank.
BRON · NHG.NL 2026
Homeowners association and apartment complex
For an apartment block, written consent from the owners association (VvE) is required in addition to the building permit. The deed of division determines who becomes the owner of the new storey. We advise on the procedural steps.
Yes, always. An additional storey substantially changes the height and profile of the building. A building permit with aesthetic review is always required. We handle the full application, including all required drawings and supporting documentation.
Q02What does an adding a storey drawing cost?
A permit-ready drawing for an extra storey on a terraced house starts from €649 incl. VAT. The price depends on the floor area of the new level, the type of building and the complexity of the connection to the existing structure. We always prepare a no-obligation fixed-price quote.
Q03Can my property support an additional floor?
We establish this through a structural calculation. The existing load-bearing walls, floor beams and foundation must be able to handle the additional load. For most post-war flat-roof terraced houses adding a storey is structurally feasible, but it varies by construction period and soil type. A structural calculation is almost always required when adding a storey.
Q04What is the difference between adding a storey and a roof extension?
Adding a storey is a full extra level on top of a flat roof, covering the entire footprint of the home or building. A roof extension is an addition or extra floor on an existing pitched roof. Adding a storey yields the most square metres but places greater demands on the load-bearing structure and the foundations.
Q05How long does the process take?
We plan the drawing by arrangement; rush is available for a surcharge. The municipal decision period for the environmental permit is 8 weeks.
Q06Do you work across the Netherlands?
Yes. We provide roof-raising drawings and permit procedures throughout the Netherlands. We do the drawing work remotely; we submit the permit to your municipality. We work from Amsterdam, remotely throughout the Netherlands, with clients from Groningen to Zeeland.
◆ Optoppen in de praktijk
19 added storey projects since 2016
13 clients rated their added storey project with an average of 4,8 out of 5 stars. A few of their comments:
JH
Jan H.Amsterdam · Adding a storey
★★★★★
We needed drawings quickly for our added storey in Amsterdam. Tekenpunt handled this fantastically. The environmental permit went through first time.
Adding a storey
KT
Khadija T.Hoorn · Adding a storey
★★★★★
Fantastic experience. We urgently needed a structural calculation for an added storey. We had the documents in no time, and the municipality of Hoorn approved without any problems. The price was very clear upfront, no surprises afterwards.
Adding a storey
MM
Mark van der M.Alkmaar · Adding a storey
★★★★★
Great help with the permit application for the added storey. The municipality of Alkmaar had a few questions about the aesthetic review, but they were resolved quickly.
Adding a storey
TP
Thijs P.Helmond · Adding a storey
★★★★★
After some searching we ended up at Tekenpunt for our added storey. What a relief! They know the rules in Helmond well. The whole process, from first sketch to approved permit, went smoothly. Our contractor was also full of praise for the quality of the drawings.