Tekenpunt / Renovations / Conversion
Renovation type · Conversion PLAN N°TRF-2026 / SCALE 1:100 / 06.2026

Conversion and repurposing for residential use

Converting an office, shop or commercial property into a home or multiple apartments. We draw up the complete change of use, assess feasibility and guide the building permit process. Across the Netherlands, from €1,995.

€1.995
Starting price
Drawing + feasibility
3-6mo
Permit
Change of use + deviation
4wk
Drawing delivery time
Express in 1-2 weeks
800+
Projects
Experience across the Netherlands
§01 What is the

What is a building conversion?

A conversion is the transformation of a non-residential function such as an office, shop or commercial building into one or more dwellings, reusing the existing shell. At Tekenpunt the drawing with feasibility check costs from €1,995, delivered within 4 weeks (express 1-2 weeks). A standard building permit takes 8 weeks.

A conversion or change of use is the transformation of a non-residential function (office, shop, commercial building) into one or more homes, reusing the existing shell. These are the elements we draw and assess.

CASCO HERGEBRUIK BOVEN BG 1 2 3 4 5 6
  • 1
    Reusing existing shell

    Load-bearing walls, columns and floors remain in place. We draw what is to be retained and what needs to be adjusted for the floor plan.

  • 2
    New floor plan layout and partition walls

    A separate floor plan per dwelling: bedrooms, bathroom, kitchen, storage. Including fire and sound-separating walls between the units.

  • 3
    Daylight and facade openings

    Residential construction requires more daylight than an office. We calculate the TOD (admitted daylight surface area) and draw additional windows or widen existing openings where needed.

  • 4
    Installations per dwelling

    Each dwelling gets its own meter cupboard, central heating installation and ventilation system. We indicate the space reservations and connection points in the design.

  • 5
    Sound and fire separation

    The Building Decree requires minimum sound insulation between adjoining dwellings and adequate fire compartmentation. We incorporate this into the structural design and details.

  • 6
    Insulation and energy performance

    A converted building must meet residential energy performance requirements. We map out the insulation package requirements and show the approach for facade, roof and floor.

§02 Quick check

Do you need a building permit?

Four questions about your situation. Quickly determine what you need.

1
What is the current function of the property?
2
Is residential use already included in the zoning plan for this plot?
3
Is the property a (national) listed building or in a protected townscape?
4
How many dwellings do you want to create?
⚠ Permit required: change of use + deviation from zoning plan

A conversion to residential use almost always requires a building permit. If residential use is not included in the zoning plan, a deviation decision is also needed. We assess feasibility, produce the design and guide the application. Request a no-obligation quote.

§03 Costs

Calculate your conversion price

Indicative calculator based on the floor area to be converted. The drawing is a fixed price; the renovation itself is carried out separately by a contractor.

Your situation

What you pay with us

  • Construction drawing for conversion€1.995
  • Selected add-ons€0
Total Tekenpunt (excl. VAT) €1.995
Request a quote for this price
The renovation itself is then handled by a contractor (not by us):
Indicative construction costs± €120.000

* We handle the design, feasibility check and (if desired) the permit. Construction itself is carried out separately by a contractor; that figure is a rough estimate based on approximately €1,500/m² and can vary significantly per situation. Request a quote for the exact drawing costs.

§04 Three variants

Which conversion suits your building?

From a single office converted into a dwelling to a building fully split into separate units. We advise on what is feasible and what yields the greatest return.

Converting a building into multiple apartments

A larger property is split into two to five independent apartments. This requires thorough fire and sound separation and independent services per dwelling.

  • PermitYes + deviation
  • Homes2-5
  • Lead time4-6 months
From €2.995

Full conversion of a shop or commercial property

A retail or commercial property (sometimes with large showroom space or storage height) is fully converted, including adjustments to facades and roof form to provide sufficient daylight and a residential appearance.

  • PermitYes + extended
  • Homes2-8+
  • Lead time5-6 months
From €3.495
§05 Comparison

Conversion vs alternatives

A conversion is the most radical way to create living space. This is how it compares to property splitting and adding a storey.

Conversion

  • From €1.995 drawing
  • Permit always required
  • Change of use: most regulatory requirements
  • Shell reuse: cost-saving
  • 3-6 months for building permit

Property splitting

  • From €1.495 drawing
  • Use was already residential
  • Less regulation than conversion
  • Property size already present
  • Lead time 4-8 weeks

Adding a storey / roof extension

  • From €1.495 drawing
  • Extra storey on top of existing building
  • Structurally complex, foundation check required
  • Permit always required
  • Higher construction costs per m²
§06 Municipalities and procedure

How does the permit procedure work?

A conversion almost always requires a building permit and a deviation from the zoning plan. The municipality decides whether it is willing to cooperate. Below are the most common situations.

Site plan
Procedure
Deadline
From
Chance
Residential use already permitted in zoning plan
Standard
8 weeks
€1.995
Large
Urban area, municipality wants to allow residential use
Deviation
3-4 months
€2.495
Good
Business zone, functional mix required
Extended deviation
5-6 months
€2.995
Depends on municipality
Listed building or protected townscape
Listed building permit
6+ mths
€3.495
Strict supervision
Agricultural or rural area
Zoning plan amendment
6-12 months
Custom work
Complex
§07 Case study

Example project: office converted to 3 apartments

CASE · ROTTERDAM · 03.2026

Former office building converted to 3 apartments

Example project · 2 storeys · change of use + deviation from zoning plan · 3 independent dwellings

3 app.
€2.995 our design
4 mo permit
4 wk drawing

Challenge: An owner in Rotterdam had a vacant two-storey office building and wanted to convert it into three rental apartments. The zoning plan did not permit residential use on this plot, and the large office windows did not meet the daylight requirements for dwellings.

Our approach: We started with a feasibility check: the zoning plan was consulted, and the municipality was approached about its willingness to grant a deviation. We then designed a new floor plan per storey, including fire- and sound-separating walls, new windows for sufficient daylight, and a service layout per dwelling. We submitted the building permit application with a deviation request to the municipality of Rotterdam.

Result: Three fully self-contained rental apartments of approximately 55 m² each, all with adequate daylight and independent installations. Permit granted after 4 months. Drawing ready 4 weeks after instruction.

§08 Regulations & info

Building regulations, zoning plan & financing

What you need to know before starting a conversion.

Check the zoning plan

We consult the zoning plan on ruimtelijkeplannen.nl and immediately establish whether residential use is already permitted on your plot or whether a deviation procedure is required. No surprises afterwards.

SOURCE · OMGEVINGSWET 2024

BBL requirements for residential

A converted building must comply with the Buildings and Living Environment Decree: daylight, sound insulation (Rc ≥ 3.5), ventilation, fire separation and energy performance. We incorporate all requirements into the design so you draw permit-ready from day one.

SOURCE · BBL / BUILDING DECREE 2026

Financing the conversion

Conversion projects may qualify for various funding options, including the Housing Stimulation Scheme and municipal conversion funds. We advise on which options may apply to your project.

SOURCE · SVN / RVO.NL 2026
§09 Frequently asked questions

FAQ about conversion and repurposing

Q01Do I need a permit for a conversion from office to residential use?

Almost always. A change of use from office, retail or commercial premises to residential is a building-permit-required activity. In most municipalities a deviation from the zoning plan is also required, because the current designation does not permit residential use. We assess feasibility and guide the application.

Q02What does a construction drawing for conversion or change of use cost?

A drawing with feasibility check for a conversion starts from €1,995 (excl. VAT). The price depends on the floor area, the number of units and the complexity. For a multiple-unit property split, the price typically starts at €2,995. Request a no-obligation quote for your situation.

Q03Am I allowed to live in an office or retail property according to the zoning plan?

It depends on the municipality and the zoning designation of the plot. In many municipalities the designation is office or retail, and residential use is not permitted without a deviation procedure. We check the zoning plan and advise whether a deviation is feasible. In urban areas with a housing demand, many municipalities are willing to cooperate.

Q04What requirements must a converted building meet?

A converted building must comply with the residential requirements of the Building Decree (BBL). The most important are: sufficient daylight per habitable room (TOD calculation), sound insulation between dwellings and to the outside (Rc ≥ 3.5 existing, stricter for new build), fire safety per dwelling (fire separation, escape routes), ventilation provisions, and a minimum energy performance. We incorporate all requirements in the design.

Q05How long does a conversion permit procedure take?

We deliver the construction drawing within 4 weeks. The permit procedure itself takes longer: for a standard building permit with a deviation from the zoning plan, allow 3 to 6 months, depending on the municipality and whether an extensive procedure is required. We keep you informed and respond to queries from the municipality.

Q06Do you work across the Netherlands for conversions?

Yes. We manage conversions from office, retail or commercial property to residential use across the Netherlands. The drawing work is done remotely; we submit the permit application to the relevant municipality. We are well acquainted with the procedures in Amsterdam, Rotterdam, Utrecht, Den Haag, Eindhoven and the surrounding regions.

§11 Plan your conversion

Start your conversion today

A fixed-price quote within 1 working day, including an initial feasibility assessment. No obligation.