Tekenpunt/Service area/Noord-Brabant
▲ Service area · Noord-Brabant NATIONAL / NL

Construction drawings in Noord-Brabant

Need a construction drawing, environmental permit or structural calculation in Noord-Brabant? Tekenpunt works throughout Noord-Brabant: permit-ready drawings from €349 incl. VAT, usually planned by arrangement (rush available for a surcharge), and 90% pass the aesthetics review first time. We draw remotely and submit the permit to your municipality.

€349Starting pricePermit-ready drawing (incl. VAT)
FastLead timeExpress possible
90%Aesthetic reviewApproved first time
2016SinceAcross the Netherlands
§01 Tekenpunt in Noord-Brabant

Permit-ready drawings in throughout Noord-Brabant

Tekenpunt delivers permit-ready construction drawings, environmental permits and structural calculations throughout Noord-Brabant, from €349 incl. VAT. We work digitally and remotely, submit the permit to your municipality and know the aesthetic-review policy of each municipality.

Whether your renovation is in a city or a village in Noord-Brabant: you get the same sharp drawings, a fixed price upfront and a single point of contact. Where needed, our own structural engineer prepares the calculation.

Building and renovating in Noord-Brabant

Noord-Brabant is one of the largest provinces by population, with cities such as Eindhoven, Tilburg, Breda and 's-Hertogenbosch alongside many villages on the Brabant sandy soil. A large proportion of the housing was built after the war during the strong growth of the Brabant cities, with historic centres such as the fortified town of 's-Hertogenbosch alongside. The sandy soil is structurally more favourable than the peat in the Randstad. Each Brabant municipality has its own aesthetic review or spatial quality policy, and we align your drawing with it per municipality.

§02 Service area

Tekenpunt in Noord-Brabant on the map

We work throughout Noord-Brabant, from the major cities to the villages in between. The map shows where our city pages are located; beyond those areas we draw just as readily, digitally and remotely.

BredaTilburgDen BoschHelmondOssRoosendaalEindhovenSERVICE AREA · NOORD-BRABANT
§03 Permit required?

Do you need a permit in Noord-Brabant?

Since the Environment and Planning Act (Omgevingswet, 1 January 2024) you apply for an environmental permit via the Omgevingsloket. Some renovations are permit-free, others require a permit. Permit check included: if a permit turns out to be required, we submit it for you for €200 incl. VAT + municipal fees (set by your municipality).

Whether you can build without a permit depends on where the structure is located (the rear-garden zone), the height and the distance to the property boundary, and the municipality's environment and planning policy. A rear dormer or small extension is often permit-free; a roof extension, a front extension or work on a listed building almost never is. Even permit-free construction must comply with the technical building requirements of the Buildings Decree (Bbl).

If a permit is required, the standard procedure applies: the municipality decides within 8 weeks, with a one-off extension of 6 weeks. Your plans are assessed against the Buildings Decree (Bbl), the environment and planning policy, and the aesthetics committee criteria. In Noord-Brabant we know and check the aesthetics policy from the municipality in advance, so your design passes the assessment first time. Read more about the applying for an environmental permit.

§04 Quick check

Do the permit check for Noord-Brabant

Answer three questions for an instant indication of whether you can build permit-free. Based on the national rules (Environment and Planning Act/Bbl); we always confirm it with a free check.

1. What type of renovation?
2. Is the structure located in the rear-garden zone (back garden, behind the front facade)?
3. Is the property a listed building or located within a protected townscape?
§05 Aesthetic review by area

Aesthetics committee & housing stock in Noord-Brabant

Every municipality assesses against its own aesthetics policy. Stringency varies within Noord-Brabant; we align your construction drawing with those requirements in advance.

CityHousing stockAesthetic review
EindhovenA large part of Eindhoven's housing stock dates from the Philips era and the post-war reconstruction period (1945-1970), with characteristic workers' districts such as Philipsdorp from the early twentieth century.By area
BredaBreda has a distinctly villa-city character with a great deal of pre-war housing: during the interwar period, villa parks such as Montenspark and Brabantpark were laid out according to the English garden-city principle.By area
TilburgTilburg has over 107,000 homes (2026), of which 39% are terraced houses and 39% are flats.By area
Den Bosch's-Hertogenbosch has a varied housing stock ranging from medieval canal-side properties and townhouses in the fortified city to post-war expansion districts from the 1950s-1980s in Noord, West and Graafsepoort, and recent urban residential environments such as the Paleiskwartier and De Groote Wielen.Strict
HelmondHelmond has approximately 43,550 homes (2025), of which 41% are mid-terraced houses, 29% are flats and 16% are end-of-terrace houses.By area
OssThe municipality of Oss has over 42,000 homes with an average property value of €383,000 (2025).More lenient
RoosendaalRoosendaal has over 35,980 homes (2025), of which 62% are owner-occupied and 74% are single-family dwellings.Strict

Strictness derived from the municipal aesthetics policy. Not an indication of price; drawings start from €349 incl. VAT everywhere.

§06 Price calculator

What does your renovation cost in Noord-Brabant?

Select your renovation for the starting price of the construction drawings in Noord-Brabant. The exact price is confirmed after a free intake, always fixed in advance and with no additional charges.

Drawings from€349 incl. VAT
Request a quote for Noord-Brabant →

Drawing work = design + permit set. Construction costs = an indication for the build by a contractor, not by us.

§12 Why Tekenpunt

Why Tekenpunt in Noord-Brabant

§13 Frequently asked questions

Construction drawing in Noord-Brabant: frequently asked questions

Q01How much does a construction drawing cost in Noord-Brabant?

A permit-ready construction drawing starts from €349 incl. VAT. The exact price depends on the type of renovation and its size; you get a fixed price upfront, with no surprise extras afterwards.

Q02Do I need a permit for my renovation in Noord-Brabant?

It depends on the type, the location (rear-garden zone) and the municipality's environment and planning policy. A rear dormer or small rear extension is often permit-free; a roof extension or work on a listed building almost never is. We carry out a free permit check upfront.

Q03How long does it take to produce a building drawing?

We plan quickly and in consultation after the intake; express delivery is available for a surcharge.

Q04How long does the planning permission procedure take?

Under the standard procedure, the municipality decides within 8 weeks, with a one-off extension of 6 weeks. Permit-free building work can start straight away.

Q05Do I always need a structural calculation?

Not always. Breakthroughs, roof extensions, extensions and anything where you bear load or open up the structure need a structural calculation. Our own structural engineer provides it wherever the municipality asks for it.

Q06Do you know the aesthetic review requirements in Noord-Brabant?

Yes. For each municipality in Noord-Brabant we check the aesthetic review policy and the zoning plan in advance, so your design passes the review first time. 90% of our designs pass the aesthetic review first time.

Q07Do you work throughout Noord-Brabant?

Yes. We draw up plans digitally from anywhere in Noord-Brabant and submit the planning permission application to the municipality where you are renovating.

§14 Get started in Noord-Brabant

Your renovation in Noord-Brabant?

We handle design, structural engineering and permit from A to Z, anywhere in Noord-Brabant. Since 2016, 930 projects. Request a no-obligation quote.

Last updated: October 2026