Flat roof (standard)
Flat-roofed dormer, straight and clean. At the rear usually permit-free and the quickest to arrange.
- PermitUsually exempt
- Extra space2-5 m²
- Lead time4 wk
More light, headroom and an extra bedroom or study in the attic. A rear dormer is often permit-free. We produce the permit-ready drawing from €595, ready in 4 weeks, 90% approved by the aesthetic review first time.
A dormer is a projection in the sloping roof that adds extra headroom and light in the attic without adding a full storey. At the rear, a dormer is often permit-exempt. Tekenpunt produces the permit-ready drawing from €595, ready within 4 weeks (express 1-2 weeks).
A dormer is an extension in the sloped roof that adds headroom and light, without a full extra storey (that is a roof extension). These are the components we draw.
The window plane moved forward. Determines how much light and view you get. Custom width and layout.
The sides of the dormer. Finished in zinc, timber or Trespa, matching the property.
The junction with the existing pitched roof. Here, the waterproofing and lead flashing are crucial.
Permit-free requires at least 0.5 m from the ridge, gutter and sides. We check this directly in the drawing.
The dormer rests on the existing rafters or a trimmer beam. For larger dormers a lightweight calculation applies.
Permit-free with a flat covering; with a permit a pitched or arched roof is also possible.
Four questions, about 30 seconds. No obligation.
A dormer at the rear of a non-listed building is usually permit-free. We produce the drawing that complies with the rules. From €595. Request a no-obligation quote for your specific situation.
Indicative calculator. The drawing is a fixed price; the construction you commission separately through a contractor.
* We handle the design and (if required) the permit. You arrange the construction separately with a dormer builder; that amount is an indication. Request a quote for the exact drawing costs.
From permit-free and sleek to a handsome roofed structure with permit. We advise on what is allowed and what looks great.
Flat-roofed dormer, straight and clean. At the rear usually permit-free and the quickest to arrange.
A pitch that follows the roof shape. More elegant and in keeping with pre-war homes. Requires a permit and aesthetic review.
A wide dormer spanning (almost) the full width of the home. Maximum light and space; often a permit is required due to the width.
A dormer is the quickest, most affordable way to make an attic usable. This is how it compares to a roof extension and a ridge raising.
The permit-free rules are the same nationwide, but for a dormer that requires a permit the aesthetic review differs per municipality. A few typical situations.
Example project · rear roof slope · permit-free · extra bedroom
Challenge: A family in Utrecht wanted to convert the attic into a full bedroom, but the sloped roof left barely any headroom. A dormer at the rear was the solution, but they did not know whether a permit was required.
Our approach: We assessed the design against the permit-free rules: rear roof slope, flat-topped, well within the distances to the roof edges. No permit required. We delivered a complete, dimensionally accurate drawing that the dormer builder could use immediately.
Result: 5 m² extra headroom, a bright bedroom and no permit procedure. Drawing in 4 weeks, installation in one day by the contractor.
A dormer is a relatively small intervention with great impact. What you still need to know.
Rear, not a listed building, flat roof, at least 0.5 m from the roof edges and at most 1.75 m high: usually permit-free. We verify this in the drawing.
SOURCE · BBL / ENVIRONMENT ACT 2026When fitting a dormer you can insulate both the dormer and the surrounding roof slope thoroughly. More comfortable and beneficial for your energy label.
ADVICE · Rc ≥ 6.3 new sectionA dormer often increases property value and can be co-financed through a renovation mortgage (up to 106% of the value after renovation).
BRON · NHG.NL 2026Often not. A dormer on the rear roof slope is usually permit-exempt if it meets the rules: a minimum of 0.5 m from the roof edges, no higher than 1.75 m and with a flat roof covering. At the front or with a listed building, a building permit is always required. We check this for free.
A permit-ready dormer drawing costs from €595. The construction itself (by a dormer builder) typically ranges between €6,000 and €15,000, depending on width, material and finish.
Permit-free limits apply: at least 0.5 m from the roof edges, a maximum height of 1.75 m and a minimum distance of 0.5 m from the eaves. If you want larger or at the front, a permit is required and we draw to your specifications.
Without a permit, a dormer must have a flat roof. With a permit, a pitched or arched roof is also possible, often more attractive and in keeping with the property. We advise what is allowed and looks best in your situation.
We deliver the drawing within 4 weeks (express 1-2 weeks). If a permit is required, allow for an 8-week municipal decision period. The installation itself usually takes only 1-2 days.
Yes. We draw dormers across the Netherlands. We work remotely; if a permit is required, we submit it to your municipality. We know or check the aesthetic policy for every municipality.
A fixed-price quote within 1 working day. Free check whether your dormer is permit-free. No obligation.