Removing a wall for an open kitchen, living-dining room or a more spacious layout. For a load-bearing wall, a steel beam and a structural calculation are the core of the job. We make the drawing from €599 incl. VAT; with structural calculation from €998 incl. VAT. We plan delivery by arrangement. An opening in a non-load-bearing wall is often permit-free; for a load-bearing wall a permit for the technical building activity is required.

€599
Starting price
Drawing (incl. VAT)
0€
Permit
Internal often permitted
Fast
Delivery time
Rush for a surcharge
930
Projects
Since 2016
§01 What is the

What is a wall opening?

A wall opening means removing an interior wall to merge two rooms into one open living space. For a load-bearing wall, a steel beam takes over the load. The drawing costs from €599 incl. VAT (from €998 incl. VAT with structural calculation) and is planned quickly and by arrangement (rush available for a surcharge). An opening in a non-load-bearing wall is often permit-free; for a load-bearing wall a permit for the technical building activity is required. You follow your entire request live in your own online file, from quote to completion.

A wall opening is the removal of (part of) an interior wall to merge two spaces. If that wall is load-bearing, a steel beam takes over the load above. These are the elements we draw and calculate.

OVERSPANNING 2 1 3 3 4 6 5
  • 1
    Existing load-bearing wall

    The wall that supports the floor or roof above. This is where we create the wall opening; the load above must be redirected elsewhere.

  • 2
    Steel beam (HEA / HEB)

    The beam that carries the load across the opening. We calculate the profile based on span and load; this is the centrepiece of the wall opening.

  • 3
    Bearing and wall plates

    On both sides the beam rests on a bearing with a steel wall plate. This is where the forces are transferred into the existing wall.

  • 4
    Temporary stamps

    During the work, temporary props support the floor so that the beam can be placed safely before the wall is removed.

  • 5
    Finishing and boxing in

    After installation the beam is boxed in and concealed in the ceiling or wall, neatly finished in the new open space.

  • 6
    Fire-resistant cladding

    Where required, the steel receives fire-resistant cladding (for example 30 or 60 minutes), so that it meets the requirements.

§02 Quick check

Do you need a building permit?

Four questions, about 30 seconds. No obligation.

1
Is the wall you want to remove load-bearing?
2
What type of home do you have?
3
How wide do you want the wall opening?
4
What is above the wall?
⚠ Load-bearing wall: permit required

An opening in a non-load-bearing wall is often exempt from a permit. For a load-bearing wall, the technical building activity applies: alongside the structural calculation, a permit is then also required, which we submit for you. Drawing from €599 incl. VAT; with structural calculation from €998 incl. VAT. Request a free quote for your exact situation.

§03 Costs

Calculate your wall opening price

Indicative calculator. The drawing with structural calculation is a fixed price; the construction work is carried out separately by a contractor.

Your situation

What you pay with us

Lines excl. VAT

  • Drawing: wall opening€495.04
  • Selected add-ons€0
  • Rush (surcharge)€0
Total incl. VAT €599
Request a quote for this price →
The construction itself comes after, through a contractor (not with us):
Indicative construction cost (steel + labour)± €1,800

* We provide the drawing and structural calculation (and permit or notification if required). The construction work is carried out separately by a contractor; that amount is an estimate per wall opening. Request a quote for the exact drawing and calculation costs.

Amounts shown are incl. VAT (consumer price); the amount below the total is the amount without VAT. Your personal quote always shows the exact total price.

§04 Packages

Choose your package

Every package includes the drawing. Add structural calculation or the full permit route.

Drawing

from €599 incl. VAT
  • Existing + new floor plans, elevations, relevant sections and site plan to scale
  • PDF + DWG files, suitable for the municipality and your contractor
  • Fixed price upfront, no cost surprises

Not included

  • Structural calculation
  • Submitted to the municipality
  • 3D visualisation
Request this package →

Drawing + structural calculation

from €998 incl. VAT
  • Everything in Drawing
  • Load schedule per Eurocode, member/support sizing, checked against the Bbl building code
  • Signed off by our own structural engineer, internally checked before release

Not included

  • Submitted to the municipality
  • 3D visualisation
Request this package →
  • Our own structural engineers and drafters work per Eurocode and check against the Bbl building code; every drawing and calculation is reviewed internally by our checkers before release.
  • 930 projects since 2016, and 90% clears the aesthetics review (welstand) on the first pass — meaning: no design change needed after the municipality's first assessment.
  • 4.9 out of 44 reviews for this type of renovation (67 projects since 2016).
§05 Three variants

Which renovation suits your home?

From a single clean wall opening to a complete replanning of a floor. We calculate the steel and draw what is permitted and what works.

Wide wall opening / merging rooms

A wide span to open two rooms into one living space. A larger span means a heavier section and a precise structural calculation.

  • PermitRequired
  • Width4 to 6 m
  • Lead timeOn quote
Price on quote

Full floor replanning

Multiple wall openings and new partition walls to fully redesign an entire floor. More beams, a comprehensive plan and a complete structural calculation.

  • PermitRequired
  • Wall openings2 or more
  • Lead timeOn quote
Price on quote
§06 Comparison

Wall opening vs alternatives

If you want more space and light, there are several ways to achieve it. A wall opening is the most affordable option and creates a much more spacious feel, but does not add floor area. Here is how it compares to an extension and a dormer.

Wall opening

  • Best value: from €599 incl. VAT
  • Non-load-bearing often permit-free
  • Open, more spacious feel
  • Delivery planned by arrangement
  • No extra m² (experience only)

Extension

  • Design from €599 incl. VAT
  • Rear often permit-free
  • 6-20 m² genuine extra space
  • Delivery planned by arrangement
  • Increases the property value

Dormer

  • Design from €379 incl. VAT
  • Rear often permit-free
  • 2-9 m² extra main space
  • Delivery planned by arrangement
  • More light in the attic
§07 What is allowed where

What is permitted in your situation?

An opening in a non-load-bearing wall is usually exempt from a permit. Removing a load-bearing wall is a technical building activity: alongside the structural calculation, a permit is then always required too. Extra rules apply for an apartment or listed building. A few typical situations.

Site plan
Calculation
Permit
Price
Attention
Non-load-bearing wall, single-family
N/A
Free
On quote
Simple
Load-bearing wall, single-family
Required
Usually exempt
On quote
Standard
Wide wall opening (4-6 m)
Required
Usually exempt
On quote
Heavier steel
Apartment / Owners' association
Required
HOA approval
On quote
HOA approval
Listed building / historic
Required
Usually required
On quote
Very strict
§08 Case study

Example project: open-plan living space

CASE · ROTTERDAM · 05.2026

Wall opening between kitchen and living room

Example project · load-bearing wall · with building permit · open living space

3,2 m span
1 building permit
€599 incl. VAT our design
Fast teken + reken

Challenge: A couple in Rotterdam wanted to merge the closed kitchen and living room into one open living space. The partition wall turned out to be load-bearing, with a residential floor above it, so simply demolishing it was not an option.

Our approach: We assessed the structure, calculated the steel beam (HEA 180 spanning 3.2 m) and drew the bearing points left and right in the existing wall. Because it was a load-bearing wall, we applied for the permit for the technical building activity, with the structural calculation included. Once the permit was granted, the contractor got started with the drawing and calculation.

Result: A spacious, light-filled kitchen-diner. Drawing with structural calculation planned quickly and by arrangement.

§09 Additional info

Permit-free, owners' association & the structure

A wall opening is a relatively minor intervention with a major effect on living comfort. What you need to know.

Permit-free?

An opening in a non-load-bearing wall is usually permit-free. A load-bearing wall is part of the main load-bearing structure: a permit for the technical building activity is then required, with a structural calculation; we include this.

SOURCE · BBL / ENVIRONMENT ACT 2026

Apartment or HOA

A load-bearing wall is part of the shared structure. For a wall opening you need approval from the owners' association; they almost always request the structural calculation.

ADVICE · Owners' association rules + calculation

Renovation mortgage

An open living space often makes the home more attractive and can be co-financed through a renovation mortgage (up to 106% of the value after renovation).

BRON · NHG.NL 2026
§10 Frequently asked questions

FAQ about wall openings

Q01Do I need a building permit for a wall opening?

That depends on the wall. An opening in a demonstrably non-load-bearing wall is usually exempt from a permit. If you remove a load-bearing wall or create an opening in one, that's a technical building activity: because structural safety is affected, a permit for the technical building activity is required, even if nothing changes on the outside. We assess this at intake, prepare the structural calculation and submit the application for you. In an apartment or with a VvE (owners' association), permission (and sometimes a notification) is also required. Extra care applies for listed buildings. We check your situation for free.

Q02What does a wall opening and structural calculation cost?

A drawing for a wall opening in a load-bearing wall costs from €599 incl. VAT; with structural calculation from €998 incl. VAT. The construction by a contractor (steel, demolition, bearing and finishing) is indicatively between €1,500 and €4,000 per opening, depending on the span.

Q03How do I know if the wall is load-bearing?

A load-bearing wall supports the floor or roof above and is usually thicker, runs perpendicular to the floor joists or continues across multiple floors. If you are unsure, we assess it on the basis of the construction drawings or a photo of the situation. A structural calculation is always required for a load-bearing wall.

Q04Is a wall opening permitted in an apartment or with a homeowners association?

Often yes, but you need permission from the owners' association (VvE) because a load-bearing wall is part of the shared structure. The VvE usually requests a structural calculation. We provide exactly the calculation and drawing that the VvE and the structural engineer need.

Q05How long does it take?

We plan the drawing with structural calculation quickly and by arrangement; rush is available for a surcharge. For a non-load-bearing wall, an opening is often permit-free and you don't need to wait for a municipal decision period. For a load-bearing wall, a permit for the technical building activity is required and the structural calculation is part of the application; we submit that application for you.

Q06Do you work across the Netherlands?

Yes. We draw and calculate wall openings across the Netherlands. We do the drawing and calculation work remotely, based on your existing drawings or survey; if a permit or notification is still required, we arrange that with your municipality.

Q07How do you recognise a load-bearing wall on a construction drawing?

Load-bearing walls are usually drawn thicker and hatched, the floor joists rest on them and they are in the same place on every floor. Certainty comes from the structural drawing in the building file or an assessment by a structural engineer.

Recognising a load-bearing wall · Requesting a construction drawing

Q08Do I need a structural calculation for a load-bearing wall?

Yes. Anyone who removes or breaks through a load-bearing wall must show that the structure remains safe. Our own structural engineer calculates the steel beam and the bearings according to the Eurocode; that calculation is part of the permit application.

Structural calculation

◆ Doorbraak in de praktijk

67 wall opening projects since 2016

44 clients rated their wall opening project with an average of 4.9 out of 5 stars. A few of their comments:

SV
Sanne V.Enschede · Wall opening
★★★★★

Great help with the permit application for the wall opening. The municipality of Enschede had a few questions about the aesthetic review, but they were resolved quickly.

Wall opening
ED
Elif D.Zaanstad · Wall opening
★★★★★

Very happy with the input. The structural calculation for the wall opening was very thorough. No hassle with the municipality of Zaanstad.

Wall opening
SV
Sander de V.Eindhoven · Wall opening
★★★★★

Great help with the permit application for the wall opening. The municipality of Eindhoven had a few questions about the aesthetic review, but they were resolved quickly.

Wall opening
FB
Femke de B.Utrecht · Wall opening
★★★★★

Very happy with the input. The structural calculation for the wall opening was very thorough. No hassle with the municipality of Utrecht.

Wall opening

View all reviews →

§12 Plan your wall opening

Start your wall opening today

A fixed-price quote as soon as possible. Free check on whether your wall opening is permit-free and whether the wall is load-bearing. No obligation.

Last updated: October 2026