Challenge: A couple from 't Gooi had purchased a plot of 850 m² and wanted to build a spacious, energy-neutral villa of 240 m². They needed an architect who could guide the complete process from design to permit, including BENG calculation and structural calculation.
Our approach: We started with a schematic design based on the building brief (living room, kitchen, 4 bedrooms, study, garage). The design was optimised for BENG-A with a heat pump, heat recovery ventilation (WTW), and 28 PV panels. After approval of the final design, we compiled the complete permit application package: construction drawings, structural calculation, BENG calculation, and site plan.
Result: The building permit was granted first time by the aesthetic review committee and the municipality within the statutory period of 8 weeks. Total process from first sketch to received permit: 4.5 months. Construction then started with the chosen contractor.