Tekenpunt/Knowledge base/DIY drawings or a drawing office?
Knowledge base · Construction drawing & process KNOWLEDGE BASE / NL

DIY drawings or a drawing office?

You want to renovate and you are wondering whether you can produce the drawings yourself. Perhaps you have already seen an online tool, or you are considering hiring an architect. The honest answer: it depends. For small, permit-free jobs you can sometimes manage with your own sketches. For a renovation that requires a permit, it is a different matter. This article compares the three routes so you can make the choice that suits your situation.

Written by Mugu, KIWA-certified structural engineerPublished 9 min read
Short answer

Drawing yourself only works for permit-free structures or as a sketch for your own use. For a permit-required renovation the municipality demands an accurately scaled 1:100 drawing with dimensions, elevations, cross-sections and material descriptions; self-made drawings are regularly rejected and every correction round pauses the 8-week decision period. A drafting agency is the practical choice when your design is already fixed (from €595 at Tekenpunt); an architect pays off for new-builds, high aesthetic ambitions or listed buildings.

Construction drawing & process

The three routes: drawing yourself, a drawing firm or an architect

Anyone planning a renovation has roughly three options.

Zelf tekenen kan met een online tool, een gratis template of gewoon op papier. Je hebt geen kosten voor het tekenwerk zelf. Maar een tekening die je zelf maakt, is zelden een vergunbare bouwtekening. Een gemeente wil een schaalnauwkeurige tekening op 1:100 met maatvoering, gevelaanzichten, doorsneden, materiaalomschrijving en de relatie tot perceelgrenzen. Dat is iets anders dan een ruwe schets van hoe je de keuken wilt uitbreiden.

Een bouwkundig tekenbureau maakt vergunbare bouwtekeningen en verzorgt vaak ook de indieningsprocedure. Je betaalt voor het tekenwerk, maar je krijgt tekeningen die aansluiten op wat de gemeente vereist. Een tekenbureau kent de lokale welstandseisen en de vereisten van het Omgevingsloket. Tekenpunt is een bouwkundig tekenbureau: geen architectenbureau, maar een bureau dat gespecialiseerd is in het vertalen van jouw bouwplan naar correcte vergunningsdocumentatie.

Een architect ontwerpt én tekent. Een architect is zinvol als je wilt dat iemand het ontwerp van je verbouwing van de grond af opbouwt: ruimtelijke indeling bedenken, esthetisch meedenken over de gevel, materialen adviseren, duurzaamheidskeuzes maken. Architecten zijn doorgaans duurder dan tekenbureaus en berekenen vaak een percentage van de bouwsom of een uurtarief. Maar ze leveren ook meer: creatief meedenken is inbegrepen. Als je al weet wat je wilt bouwen en alleen vergunbare tekeningen nodig hebt, is een architect meestal meer dan je nodig hebt.

In short: drawing it yourself only works for permit-free situations. A drawing firm is the practical choice if you need permit-ready drawings but the design is already decided. An architect is valuable if you also want to outsource the design or if your building ambition calls for a distinct architectural vision.

When is a construction drawing firm the right choice?

Most standard renovations to a home fall into a category where a drawing firm offers the best value for money. Think of:

  • Een aanbouw of uitbouw aan de achterzijde van de woning
  • Een dakkapel aan de voor- of achterkant
  • Een dakopbouw of het verhogen van de nok
  • Het samenvoegen van kamers door het weghalen van een wand
  • Een bijgebouw of garage die buiten de vergunningsvrije grenzen valt
  • Het omzetten van een pand naar een andere bestemming (bijvoorbeeld wonen boven een winkel)

In all these cases the design is usually already established: you know what you want and may have already consulted a contractor. What you need are correct permit documents: a site plan, before and after floor plans, facade elevations, a section drawing and, if required, a structural calculation. That is exactly what a drawing firm provides.

A drawing firm can also be brought in more quickly than an architect. Architects often plan months in advance; drawing firms are generally available at shorter notice. If you have already booked a contractor for a particular period, that speed is a factor.

When is an architect actually the better choice?

There are situations where an architect adds more value than a drawing firm, and where it is wise to be honest about that distinction.

Je bouwt een volledig nieuw gebouw. Bij nieuwbouw speelt het ontwerp een grotere rol dan bij een standaard verbouwing. Een architect denkt mee over de oriëntatie op het perceel, de daglichtinval, de indeling van verdiepingen, duurzame materialen en de relatie tot de omgeving. Bij een uitbouw van drie meter diep is dat minder relevant; bij een nieuw vrijstaand huis wel.

Je hebt hoge esthetische ambities. Als de uitstraling van je verbouwing echt bijzonder moet zijn, als je iets wilt dat echt ontworpen voelt in plaats van alleen vergund, dan verdient een architect de voorkeur. Architecten zijn opgeleid om ruimtelijke en esthetische keuzes te maken die een tekenbureau niet maakt.

Je pand is een rijksmonument of staat in een beschermd stads- of dorpsgezicht. Bij monumenten gelden aanvullende eisen vanuit de erfgoedregelgeving. De welstandstoets is strenger en de kans op afwijzing bij een niet-professioneel ingediende aanvraag is groter. Een architect met ervaring in monumentenzorg kent de verwachtingen van de monumentencommissie.

Je wilt volledige projectbegeleiding. Architecten kunnen ook de aanbestedingsprocedure begeleiden, contracten opstellen en toezicht houden tijdens de bouw. Als je een grote verbouwing hebt en geen tijd wilt besteden aan coördinatie, is een architect als projectleider een optie.

In all other cases a drawing firm is the faster and more affordable choice, without any sacrifice in the quality of the permit documents.

What you can do yourself and where the risk lies

If your plan is permit-free, you can generally get started yourself. A storage shed in the rear garden area that falls within the size limits, a small dormer window on the rear roof slope that meets the conditions of the Building Decree (Bbl): for these you need neither a permit nor, in principle, a professional drawing. Note: even without a permit, your structure must meet technical requirements. A structural calculation is legally required for permit-free construction in certain cases.

For renovations requiring a permit things become more complex. The risks accumulate.

Maatfouten en schaalfouten. Een tekening op 1:100 met verkeerde maatvoering leidt tot een aanvraag die de gemeente buiten behandeling stelt. Dat is nog vóór de inhoudelijke beoordeling.

Welstandseisen. Elke gemeente heeft criteria waaraan het uiterlijk van een bouwwerk moet voldoen. Die staan in het omgevingsplan (of de nog geldende beleidsregels). Als je de welstandsregels voor jouw adres niet kent, loop je kans dat de adviescommissie omgevingskwaliteit je plan afwijst op uiterlijk, niet op technische fouten.

Constructieve eisen. Bij een aanbouw of het weghalen van een dragende wand wil de gemeente een constructieberekening zien. Een tekening zonder constructieve onderbouwing is onvolledig en stopt de procedure.

Indieningsvereisten van het Omgevingsloket. Het Omgevingsloket genereert bij een aanvraag een checklist op basis van jouw specifieke situatie. Wat er precies op staat, verschilt per bouwwerk en per gemeente. Een onvolledige indiening pauzeert de beslistermijn totdat alle stukken zijn aangeleverd.

The risks of drawing it yourself: rejection, a correction round, and delay

Drawing it yourself for a renovation that requires a permit sounds attractive, but in practice it leads to problems more often than expected. There are three concrete risks.

Afkeuring door welstand. Veel mensen weten niet dat er naast technische eisen ook welstandseisen gelden. De adviescommissie omgevingskwaliteit toetst of het uiterlijk van je bouwplan past binnen de omgeving. Die commissie kijkt naar materiaalkleur, gevelindeling, nokrichting, verhoudingen. Als je een dakkapel tekent die niet voldoet aan de welstandsregels voor jouw straat, wordt je aanvraag afgewezen, ook al zijn de technische maten verder correct. Een tekenbureau dat de lokale welstandsnota kent, vangt dit voor je op.

De herstelronde. Als een aanvraag buiten behandeling wordt gesteld vanwege ontbrekende stukken, of als de gemeente aanvullende informatie opvraagt, gaat de beslistermijn op pauze. Je moet de ontbrekende documenten aanleveren, waarna de termijn weer verder loopt. Elke herstelronde kost je meerdere weken. Als je twee of drie keer heen en weer gaat, ben je al snel twee tot drie maanden verder.

Vertraging met directe gevolgen. Als een aannemer al geboekt staat, lopen die weken vertraging door in je planning. Een aannemer die vaststaat voor een bepaalde periode, kan jouw werk niet altijd verzetten. In het slechtste geval wacht je maanden op een nieuwe beschikbare periode. Die kosten zijn onzichtbaar maar reëel.

A drawing firm that is familiar with the local requirements and those of the Omgevingsloket significantly reduces the risk of a rejection or a revision round. Tekenpunt has a first-submission success rate of 90%.

The costs looked at honestly

A drawing office costs money. At Tekenpunt a construction drawing starts from €595. That feels like a barrier to some people, especially when you see that free tools exist.

But the comparison is not 'drawing firm versus free tool'. The comparison is 'drawing firm versus what goes wrong when the application is incorrect'.

An application that is not accepted for processing by the municipality means starting over and paying permit fees again. Municipalities refund permit fees for a rejected application only partially or sometimes not at all. Expect weeks of delay that accumulate while a contractor is already booked or materials have already been ordered.

A rejection by the aesthetic review committee leads to the same: redesign, resubmission, a new waiting period of several weeks.

A mistake in the drawing that only surfaces once the contractor has already started can, in the worst case, result in revision costs that are a multiple of the cost of a drawing firm.

Architect versus tekenbureau: kwalitatieve kostenvergelijking. Architecten werken doorgaans met een percentage van de bouwsom (voor kleine projecten vaak 8-15%) of met een uurtarief. Dat maakt een architect voor een standaard dakkapel of uitbouw al snel duurder dan een tekenbureau, zonder dat je daar extra ontwerpwerk voor terugkrijgt als je al weet wat je wilt bouwen. Bij een volledig nieuw huis of een ambitieus project kan die hogere investering de moeite waard zijn.

Die risico's zijn niet hypothetisch. Ze zijn de reden waarom veel mensen die eerst zelf probeerden te tekenen, toch bij een tekenbureau uitkomen, soms na een afkeuring die ze tijd en geld heeft gekost. Bekijk ook het artikel Wat kost een bouwtekening en vergunning? voor een overzicht van alle kostenposten.

When drawing it yourself is fine and when it really is not

Zelf tekenen kan prima als:

  • Je bouwwerk vergunningsvrij is (doe altijd eerst de vergunningcheck op het Omgevingsloket, die check is gratis)
  • Je een eenvoudige schets maakt voor eigen gebruik, om je ideeën te ordenen of aan een aannemer te laten zien
  • Je een grof ontwerp wil uitwerken dat je daarna aan een tekenbureau overdraagt

Zelf tekenen werkt niet goed als:

  • Je een vergunningsplichtige verbouwing plant, zoals een aanbouw, een dakkapel aan de voorzijde, een dakopbouw of een serre die buiten de vergunningsvrije grenzen valt
  • Je pand een rijksmonument is of in een beschermd stads- of dorpsgezicht ligt: dan gelden strengere regels en is de kans op afwijzing bij een niet-professionele aanvraag groot
  • Je bouw constructieve ingrepen bevat, zoals het weghalen van een dragende wand of het plaatsen van een nieuwe draagconstructie
  • Je gemeente streng toetst op welstand en jij de lokale criteria niet kent
  • Je haast hebt: een afgekeurde aanvraag kost meer tijd dan een correcte aanvraag bij een tekenbureau

If you are unsure about your own situation: do the permit check via the Omgevingsloket. That gives a free indication. If you cannot work it out, a drawing office can also do that preliminary work for you.

The hidden costs of an incomplete application

The direct costs of drawing yourself are low. The hidden costs are the problem.

An application that is set aside is legally treated as if it was never submitted. You pay permit fees again on the next attempt. Permit fees vary considerably depending on the municipality and the construction cost; municipalities are not obliged to refund fees for an inadmissible application.

Then there is the delay. The standard decision period for a building permit is 8 weeks, which the municipality may extend once by 6 weeks. But that clock only starts running when your application is complete. Every time the municipality asks for missing documents, that period is paused. Your building project comes to a standstill.

Then there are the additional costs if the build has already started: a standstill with a contractor who charges per day, extra additional work if the wrong structure has already been built, adjustment costs if the municipality enforces retrospectively.

Een tekenbureau inschakelen is, in het licht hiervan, eerder een verzekering tegen vertraging en herwerk dan een extra kostenpost. Tekenpunt begeleidt de aanvraag van tekening tot indiening via het Omgevingsloket. Meer over hoe dat werkt lees je op de pagina werkwijze.

More on this subject

Getting a construction drawing made Building permit application How we work Full knowledge base
Frequently asked questions

Frequently asked questions

Q01Am I allowed to submit a construction drawing myself to the municipality?

You may. There is no law stating that a construction drawing must be made by a professional. But the municipality sets substantive requirements for the drawing: scale accuracy (generally 1:100), correct dimensions, elevation views, cross-sections and material information. If your drawing does not meet these requirements, the application will be set aside or rejected. The freedom to submit yourself is separate from the question of whether the drawing will be accepted.

Q02Is an architect needed for an extension or dormer?

For most standard renovations such as an extension, rear addition, or dormer window, an architect is neither required nor necessary. A construction drawing firm produces the permit-ready drawings you need. An architect is valuable if you also want design advice: how to divide the space, what the facade should look like, which materials suit the neighbourhood. If you already know what you want to build and simply need the permit drawings and submission process handled, a drawing firm is usually the more appropriate and more affordable choice.

Q03What is the difference between a construction drawing firm and an architecture firm?

A construction drawing firm translates an existing building plan into correct permit documents: drawings, site sketches, and the submission process. You already know what you want to build; the drawing firm ensures it is correctly set out on paper for the municipality. An architecture firm does the same, but adds the design process on top: contributing ideas about layout, aesthetics, and materials. That additional design work makes architects more expensive. Tekenpunt is a construction drawing firm: we draw what you have already decided on and make sure the municipality accepts it.

Q04How do I know whether my renovation is permit-free?

Run the permit check at omgevingsloket.nl. The check is free and can be completed without logging in. You enter the address, the location on your plot (front or rear garden area), and the dimensions. The result indicates whether you may build permit-free, whether you need to submit a notification, or whether you need a full environmental permit. Always run this check before you start, even if you think your plan is permit-free. Note: even for permit-free construction, technical requirements from the Bbl apply.

Q05What does it cost if my application is rejected?

If the municipality sets your application aside (because it is incomplete) or rejects it, you will generally pay fees again for a new submission. How much of the fees you already paid you get back varies by municipality and by reason for rejection. On top of the fees you incur delay which, if a contractor is already booked, also brings indirect costs. This is one of the reasons why a correct application at the outset works out cheaper than a resubmission process.

Q06Can my plan be rejected because of its appearance, even if the dimensions are correct?

Yes. In addition to technical requirements, the municipality also assesses whether the appearance of your building plan fits within the surrounding environment. This is called an aesthetic review. Every municipality has an aesthetic review policy or comparable policy rules describing how facades, roof forms and materials should look. An environmental quality advisory committee evaluates this. If your plan is technically correct but the committee rejects the appearance, you must redesign and resubmit. A drawing firm that is familiar with the local aesthetic review requirements prevents this situation.

Q07Which documents do I need for an environmental permit?

The Omgevingsloket generates a checklist for your application based on your specific situation. Exactly what is on it varies by type of structure and by municipality. Standard documents requested are: a site plan, existing and new floor plans at scale 1:100, facade elevations on all sides, a section, and a materials description. For structural interventions a structural calculation is added. A drawing firm is familiar with these requirements and delivers a complete package.

Q08How long does it take to obtain an environmental permit?

The standard procedure takes a maximum of 8 weeks. The municipality may extend that period once by 6 weeks. But the clock only runs if your application is complete at the time of submission. Every time the municipality requests additional information, the clock pauses. An incomplete or incorrect application can therefore easily double the turnaround time. For urgent cases, Tekenpunt also offers an express service with a shorter delivery time for the drawings themselves.

Get started

Ready for your renovation?

We handle design, structural engineering and permits from A to Z, across the Netherlands. Since 2016, 800+ projects. A no-obligation quote within 1 working day.

Last updated: July 2026Content reviewed by the Tekenpunt team · construction draughtsman & KIWA-certified structural engineer in house