After some searching we ended up at Tekenpunt for our roof extension. What a relief! They know the rules in Amsterdam well. The whole process, from first sketch to approved permit, went smoothly. Our contractor was also full of praise for the quality of the drawings.
Roof extensionRoof extension in Amsterdam
For this project in Amsterdam we prepared the construction drawing and supported the permit application for a roof extension. The client rated the collaboration 5 out of 5 stars.
Roof extension in Amsterdam
Just like our other roof extension projects, we prepare the permit-ready drawing in advance and check the Amsterdam municipality's aesthetics review requirements, so the plan has the best chance of passing in one go. A roof extension project with Tekenpunt starts from €649 incl. VAT, with a fixed price upfront and delivery planned by arrangement (rush available for a surcharge).
Key project details
- Type
- Roof extension
- Location
- Amsterdam, Noord-Holland
- Year
- 2025
- Drawing price from
- €649 incl. VAT
- Klantbeoordeling
- 5/5 sterren
Wat Tekenpunt standaard levert
- Existing and new situation drawings (floor plan, elevations, sections)
- Guidance with the environmental permit and the aesthetic review
- Fixed price upfront, no cost surprises
- One fixed point of contact, fully remote
What the client said
Roof extension in Amsterdam: frequently asked questions
Q01What does a roof extension cost in Amsterdam?
A permit-ready drawing for a roof extension starts from €649 incl. VAT at Tekenpunt. The exact price depends on the size and complexity; you get a fixed price upfront, with no surprise extras afterwards. Request a no-obligation quote.
Q02Do I need a permit for a roof extension in Amsterdam?
That depends on the type of work and the rules of the municipality of Amsterdam. We check the local aesthetic-review policy and the zoning plan in advance, so you know where you stand.
Q03How long does a roof extension take from drawing to building permit?
We deliver the construction drawing by arrangement (see your quote), with rush delivery faster for a surcharge. The permit procedure itself takes eight weeks for a regular application (Omgevingswet).
Got a similar project in mind?
Whether you live in Amsterdam or elsewhere in the Netherlands: we handle design, structural engineering and permit from A to Z. Since 2016, 930+ projects. Request a no-obligation quote.