New roof in Arnhem

A corner house in Arnhem-Noord from the early 1970s had an almost completely rotten roof structure. We drew the full replacement of the roof construction with a heavy insulation package of Rc 4.5 and handled the complete permit notification. The contractor could start immediately after approval.

TypeNew roof
LocationArnhem
Surface arearoof surface 95 m² + insulation
Lead timeBuilding permit 4 weeks
Year2025
ResultCompletely new roof
§01 From sketch to completion

The complete process

01 · Challenge

Near-rotten roof on a corner house in Arnhem-Noord

The owners of a corner house in the Presikhaaf district of Arnhem discovered during a renovation inspection that several rafters and the ridge beam had been affected by wood rot. The situation was so serious that partial repair made no sense: the complete roof had to be replaced. At the same time, this was the ideal moment to raise the insulation value from the minimal Rc 0.4 to a contemporary Rc 4.5 package. The corner location made the structural assignment more complex due to the intersecting roof planes.

02 · Our approach

Integrated design, including corner detail

We drew the complete replacement of the roof structure, including a special corner detail for the junction of the two roof planes. The purlins, trusses and ridge beam were dimensioned in line with current load standards. The insulation package consists of 200 mm PIR insulation on the purlins, with a vapour barrier and a water-resistant underlay. We arranged the permit notification with the municipality of Arnhem with all required appendices, including the structural report and insulation calculation.

03 · Result

Completely new roof, building permit in 4 weeks

The permit notification was approved within 4 weeks. The roofer could start immediately with the construction-ready documents. The new roof has a full insulation layer of Rc 4.5, new battens and new ceramic roof tiles that match the colour of the housing row. The corner detail is neatly finished with a custom zinc gutter piece. The residents reported a noticeably lower gas consumption after the first winter.

Key project details

Drafting
Roof structure + corner detail
Permit
Permit notification in 4 weeks
Insulation
Rc 4.5 (200 mm PIR)
Surface area
95 m² roof area total
Lead time
Sketch to permit in 4 weeks

What we delivered

  • Existing and new situation drawings of roof construction
  • Corner detail drawing for the junction of two roof planes
  • Structural calculation for purlins and ridge beam
  • Insulation calculation and vapour barrier specification
  • Permit notification to municipality of Arnhem
  • Roof edge and gutter details for the roofer
§03 Need a new roof yourself?

Got a similar project in mind?

Whether you live in Arnhem, Gelderland or anywhere else in the Netherlands: we handle design, structural engineering and permits from A to Z. Since 2016, 800+ projects. A no-obligation quote within 1 business day.