Tekenpunt / Projects / Mezzanine floor Utrecht
Completed project · Mezzanine floor PLAN N°PRJ-UTR-2024 / SCALE 1:100 / 2024

Mezzanine floor in Utrecht

A former factory space in Utrecht-Lombok was converted into a loft apartment with a mezzanine floor. We handled the design and structural calculation. The additional floor level on steel beams increases the living area by 22 m² without requiring a permit.

TypeMezzanine floor
LocationUtrecht
Surface area+22 m²
Lead timeInternal, no permit required
Year2024
ResultOpen living space
§01 From sketch to completion

The complete process

01 · Challenge

Using high ceilings without a permit

The owners of a loft apartment in a former factory in Utrecht-Lombok had almost 5 metres of clear height but little usable floor area. A mezzanine floor seemed the solution. The challenge lay in the structure: the existing concrete external walls could not be pierced for beam support, and the floor had to comply with the fire safety requirements of the Building Decree without a permit being required.

02 · Our approach

Self-supporting steel structure on columns

We designed a self-supporting steel structure on four slender columns standing on the existing concrete floor. The structural engineer calculated the HEA beams for deflection and fire rating. Because the columns are on the inside and are not anchored to the external wall, no building permit was required. The design took into account the clear headroom on both levels and the existing window positions.

03 · Result

22 m² extra living floor, loft character preserved

The mezzanine floor adds 22 m² of extra floor area on the sleeping level, with an open balustrade that preserves the loft feel. The structure was assembled in 3 days. The openness of the space has been retained: the ground floor benefits from double height in the central living area. No permit required, no aesthetic review.

Key project details

Drafting
Construction drawing + steel details
Permit
Permit-free (internal)
Structure
HEA beams on 4 steel columns
Fire class
Calculated in accordance with the Building Decree
Lead time
Drawing ready in 2 weeks

What we delivered

  • Upper and lower level floor plans with dimensions
  • Structural calculation for HEA beams and column foundations
  • Cross-sections with clear passage height and fire class documentation
  • Staircase detail and balustrade design
  • Permit-exempt confirmation on drawing
  • Construction-ready details for the steel contractor
§02 Frequently asked questions

Mezzanine floor in Utrecht: frequently asked questions

Q01What does a mezzanine floor cost in Utrecht?

A permit-ready drawing for a mezzanine floor starts at Tekenpunt from €595. The exact price depends on the scope and complexity; you receive a fixed price upfront with no additional billing. Request a no-obligation quote.

Q02Do I need a building permit for a mezzanine floor in Utrecht?

That depends on the type of intervention and the rules of the municipality of Utrecht. We check the aesthetic review policy and the zoning plan in advance, so you know where you stand and your plan typically passes the review in one go.

Q03How long does a mezzanine floor take from drawing to building permit?

We deliver the construction drawing within 0-3 weeks, or 0-2 weeks on an urgent basis. The permit procedure itself takes eight weeks for a standard application (Environment Act).

More about mezzanine floor Construction drawing in Utrecht All renovations
§03 Adding a mezzanine floor yourself?

Got a similar project in mind?

Whether you are in Utrecht, the Randstad or elsewhere in the Netherlands: we handle design and structural calculations from A to Z. Since 2016, 800+ projects. A no-obligation quote within 1 business day.

Last updated: July 2026 Content reviewed by the Tekenpunt team · construction draughtsman & KIWA-certified structural engineer in house