Mezzanine floor in Utrecht

A former factory space in Utrecht-Lombok was converted into a loft apartment with a mezzanine floor. We handled the design and structural calculation. The additional floor level on steel beams increases the living area by 22 m² without requiring a permit.

TypeMezzanine floor
LocationUtrecht
Surface area+22 m²
Lead timeInternal, no permit required
Year2024
ResultOpen living space
§01 From sketch to completion

The complete process

01 · Challenge

Using high ceilings without a permit

The owners of a loft apartment in a former factory in Utrecht-Lombok had almost 5 metres of clear height but little usable floor area. A mezzanine floor seemed the solution. The challenge lay in the structure: the existing concrete external walls could not be pierced for beam support, and the floor had to comply with the fire safety requirements of the Building Decree without a permit being required.

02 · Our approach

Self-supporting steel structure on columns

We designed a self-supporting steel structure on four slender columns standing on the existing concrete floor. The structural engineer calculated the HEA beams for deflection and fire rating. Because the columns are on the inside and are not anchored to the external wall, no building permit was required. The design took into account the clear headroom on both levels and the existing window positions.

03 · Result

22 m² extra living floor, loft character preserved

The mezzanine floor adds 22 m² of extra floor area on the sleeping level, with an open balustrade that preserves the loft feel. The structure was assembled in 3 days. The openness of the space has been retained: the ground floor benefits from double height in the central living area. No permit required, no aesthetic review.

Key project details

Drafting
Construction drawing + steel details
Permit
Permit-free (internal)
Structure
HEA beams on 4 steel columns
Fire class
Calculated in accordance with the Building Decree
Lead time
Drawing ready in 2 weeks

What we delivered

  • Upper and lower level floor plans with dimensions
  • Structural calculation for HEA beams and column foundations
  • Cross-sections with clear passage height and fire class documentation
  • Staircase detail and balustrade design
  • Permit-exempt confirmation on drawing
  • Construction-ready details for the steel contractor
§03 Adding a mezzanine floor yourself?

Got a similar project in mind?

Whether you are in Utrecht, the Randstad or elsewhere in the Netherlands: we handle design and structural calculations from A to Z. Since 2016, 800+ projects. A no-obligation quote within 1 business day.

Last updated: June 2026 Content reviewed by the Tekenpunt team · in-house architect & KIWA-certified structural engineer